>
Slope stabilization for residential slope failure at Yerba Buena Island with PROPEX
september 2024
Yerba Buena Island's redevelopment addressed slope failure with PROPEX Armormax, ensuring slope stability, erosion control, and utility protection during a major residential project.
Filter by
Palm Desert flood control improvements with PROPEX protects from tropical storms
The City of Palm Desert improved flood control infrastructure by expanding the Section 29 Basin, constructing two new basins, and armoring the Mid-Valley channel with PROPEX® Armormax®.
Motiva Brine pond liner replacement and leak inspection with GSE
The Motiva Brine Pond in southeast Texas, supporting butane storage in salt caverns, underwent primary liner replacement and inspection to address leakage issues.
Relining Aeration Basin 2 at Thompson's Station wastewater plant
Aeration Basin 2 at Thompson's Station wastewater plant was relined in 2012 using a custom GSE HD geomembrane system, ensuring operational efficiency.
Geosynthetic reinforcement to successfully repair a railway track section
CN Railway utilized MIRAFI® RS580i to stabilize track foundations at the Rosetown subdivision, improving safety, and reducing future maintenance costs in challenging conditions.
Restoring tidal wetlands and providing long-lasting erosion protection
The Department of Water Resources (DWR) successfully restored natural tidal wetlands in the Sacramento–San Joaquin Delta, enhancing habitats for wildlife and improving flood management.
Protecting homes from destructive erosion and slope instability with PROPEX
In Fort Worth, Texas, Candleridge Park addressed erosion threatening neighborhood foundations by constructing a channel outlet and using PROPEX® Pyramattress® and PROPEX® Pyramat® 75 for cost-effective, sustainable slope protection.
Mitigating the risks of groundwater contamination during expansion of Sarasota Municipal Landfill
Advanced leachate containment solutions were utilized to enhance the Sarasota landfill expansion, ensuring environmental protection and compliance with regulations.
Bridging sinkhole voids with MIRAGRID XT
Thurber Engineering and Solmax used MIRAGRID XT geogrid to remediate William Griffin Recreation Centre's turf, stabilizing voids and enhancing field performance.
Trilogy at Monarch Dunes, Nipomo, California
Monarch Dunes needed a sustainable solution for severe channel erosion in a community vineyard. The combination of PROPEX Armormax and Pyramattress provided durable, eco-friendly stabilization, reducing installation time and cost.
Protecting homes from flooding events with PROPEX Armormax
Baton Rouge's flood mitigation measures included PROPEX Armormax to reduce risks and protect homes against future flooding.
Improving the grading and capacity of an existing channel
The Lloydminster's Northwest Drainage Channel was redesigned to prevent flooding, using PROPEX Pyramat for enhanced flow capacity and erosion control.
Stabilization and construction of a new arterial roadway in using MIRAFI
Effective stabilization of fine-grained subgrade soils and the implementation of MIRAFI RS580i led to a new roadway that exceeded performance expectations.
Roadway reconstruction on STH-106 with MIRAFI
Jefferson County Highway Department successfully reconstructed Wisconsin Highway 106 over marshland, using geosynthetic materials to minimize excavation and ensure a stable, well-drained road surface.
Overcoming soft soil challenges with MIRAFI
Utilizing MIRAFI RS580i for stable construction, the East Lake Sammamish Trail overcame soft soil challenges, reducing costs and material waste effectively.
Enhancing frac pond liner integrity with the GSE Leak Location Suite
The GSE Leak Location Suite, including the S-100 Spark Tester, was successfully implemented at a frac pond project in Laredo, Texas, ensuring leak-free installation and quick identification of punctures in the liner.
Meeting subgrade stabilization challenges with MIRAFI
Utilizing MIRAFI RS380i geotextile fabric, this project overcame poor subgrade conditions to construct four commercial buildings with stable platforms for parking lots and loading docks.
Biogas cover turns palm oil waste into fuel in Malaysia
Cenergi transforms POME into renewable biogas in Malaysia, using GSE geomembranes. This project reduced GHG and the approach highlights innovation in waste recycling and contribution to renewable energy goals.
Enhancing road resilience in Alaska with MIRAFI
Alaska's Dalton Highway demonstrated the effectiveness of MIRAFI H2Ri in enhancing road durability and reducing maintenance in extreme environments.
IMAX parking lot's innovative stormwater system with MIRAFI
In 2012, Mississauga's IMAX parking lot implemented a low impact development system to manage stormwater, enhancing water quality and maintaining pavement integrity.
Meeting stringent CCR regulations with BENTOLINER
Xcel Energy successfully closed Sherco Pond No.1 and constructed Sherco Pond No.2 using BENTOLINER to meet stringent CCR regulations, ensuring minimal environmental impact and continuous service.
How Impact Solar Farm overcame road stabilization challenges with MIRAFI
MIRAFI RS280i was used at Impact Solar Farm in Texas for efficient road stabilization, offering environmental benefits and cost savings.
Sewage lagoon upgrade using geosynthetic clay liners
Discover how Conquest's sewage lagoon upgrade using a geosynthetic clay liner overcame groundwater challenges, enhancing efficiency and reducing costs.
Increasing roadway design life with MIRAFI
116th Ave in Grande Prairie was reconstructed using MIRAFI H2Ri, overcoming failures from heavy traffic and challenging soil, improving road longevity and performance.
Lining canals for mega Port Said aquaculture project
Egypt's mega aquaculture project in East Port Said completed phase two, using GSE HD geomembrane for water containment in a 20,000-acre fish and shrimp farm.
Conquering extreme conditions with a high-temperature liner solution
Saskatchewan's first new potash mine in 40 years features advanced GSE HDH liners in its brine ponds, overcoming extreme temperatures and chemical exposure.
Kaneohe Stream bank restoration
Hawaii's Kaneohe Stream stabilization project used PROPEX Pyrawall, a natural, vegetated solution, to protect properties and prevent flooding for up to 75 years.
Murrieta Creek stabilization
Murrieta Creek's flood control project uses PROPEX Armormax for erosion protection and environmental restoration, ensuring safety and water quality for 75 years.
Oyster Lake outfall improvement
Oyster Lake's outfall, strained by storms and urban growth, was reinforced using PROPEX Armormax for erosion control. It withstood Hurricane Michael, protecting the area.
Harvey Ditch erosion protection with PROPEX
BKDD used PROPEX Scourlok for durable, environmentally-friendly erosion protection along a drainage channel in Texas, replacing gabion baskets with a long-lasting solution.
GSE Leak Location Conductive liner 24 years later
At the Florence Copper mine in Arizona, a pond built in 1997 with GSE Leak Location liner, operated for 24 years. Initially underutilized, its expansion required inspection of the exposed geomembrane.
Anchorage regional landfill-expansion project
In 2020, Anchorage expanded its landfill with a new cell, installing a composite liner system that included BENTOLINER, GSE HD liner, and HDPE piping.
Providing long term stabilization for drainage channel
PROPEX Armormax and PROPEX Pyramattress, an engineered mattress system that uses PROPEX Pyramat 75 HPTRM to construct a geosynthetic/soil/rock composite for protection of channels, slopes, and spillways.
Steep slope stabilization at SR-11 KYTC DISTRICT 10
The PROPEX Armormax system helped KYTC meet their goal of providing a safe, efficient, environmentally sound and fiscally responsible option to repair the slope while also ensuring access to the state park and economic growth in the surrounding area.
Providing levee resilience and durability
Full scale installation of the EEAS began in 2015 and has since been installed on over 100 miles of earthen levees in the New Orleans area. Since installation, multiple levees have experienced overtopping from major hurricanes, but have not breeched.
Preventing flooding from arid creeks
PROPEX Armormax helped to decrease sedimentation and pollutants and encourages infiltration of water back into the ground water table.
Restoring stream bank while promoting vegetation
Since the completion of the project, the stream has naturally restored itself to its original channel depth.
Channel stabilization protects against floods
The end goal of the project is to carry water from future 100-year floods through the city in the channel and eliminate flooding in Randolph.
Flood protection and erosion control with PROPEX Pyramat
PROPEX Pyramat is a High Performance Turf Reinforcement Mat (HPTRM) that protects the ground surface from erosion while promoting natural vegetation.
Reinforcing slopes in parking lot
Eight, one foot, PROPEX Pyrawall lifts were constructed to raise the grade for the new parking lot.
Stabilizing the Des Moines River with PROPEX
The west fork of the Des Moines River in Palo Alto County, had experienced years of erosion and flooding. From 2006 to 2019, the riverbank had receded up to 215 feet in the middle of the bend.
Enhancing runway durability with Petromat Enviro
The Altoona-Blair County Airport, a regional airport in central PA, faced a safety concern with one of its runways. Reflective cracking had occurred due to harsh freeze/thaw conditions during winter months.
GEOTUBE dewatering and containment of gypsum wastes at a titanium dioxide plant
Industrial waste, often in slurry form and containing contaminants, needs to be managed and disposed of properly to protect the environment.
GEOTUBE directs fly ash slurry flow in tailings storage facility closure
GEOTUBE dewatering technology is a cost-effective method for removing water from industrial and mineral slurries and sludges.
GEOTUBE breakwaters: shoreline protection at Sigandu Beach
The breakwater structure constructed with the GEOTUBE system at Sigandu Beach proved to be a cost-effective solution compared to conventional methods such as rock armor.
Maximizing mineral recovery with dewatering for a remote gold mine in Indonesia
A remote gold mine located on an Indonesian island required the dredging of heavily silted settling ponds. These ponds contained valuable gold deposits that needed to be recovered and reprocessed.
Recovering fertilizer from palm oil mill effluent (POME) with GEOTUBE dewatering technology
GEOTUBE units are used to dewater the POME sludge. The units retain the solid particles within the tube, while the liquid can be recycled back through the plant or discharged through the polishing ponds.
GEOTUBE solution for rare earth waste containment and dewatering
Processing and refining rare earth minerals generates a waste stream that must be managed and stored in an environmentally secure manner.
Overcoming workspace constraints in urban municipal wastewater treatment plant
The project involved upgrading an old, aerated sewage lagoon into a modern enclosed underground sewage treatment facility.
Mine wastewater management at MMG Rosebery Gold Mine
The MMG Rosebery mine in Tasmania has been a successful underground mining operation for over 80 years, producing gold, zinc, copper, and lead concentrates.
Transforming coal mine settling ponds with GEOTUBE dewatering
A large Indonesian mining corporation faced a challenge in dewatering silt sediments from their settling ponds in South Kalimantan, Indonesia.
Durable GEOTUBE solution for Clark Airport waterway revetment
The GEOTUBE SFM serves as revetment for the entire waterway network at the new Clark Airport Terminal.
GEOTUBE dewatering: Innovative submerged sediment removal at Brisbane River
In a groundbreaking project in Australia, a specially designed remote-controlled underwater dredger was used to clear and clean a blocked stormwater drain that discharged into the Brisbane River.
Asia's longest dewatering GEOTUBE in Indonesia's Kalimantan region
This project holds the distinction of being Asia's longest GEOTUBE dewatering project.
Revitalizing Tianjin Eco-City: Sustainable wastewater cleanup and transformation
The GEOTUBE dewatering containers were used to contain the dredged slurry and remove water from the material, achieving a consistency similar to compacted borrowed material.
The longest sea-crossing bridge constructed with GEOTUBE
Over 27 km (16.8 miles) of geotextile tubes were installed for the construction of the Lach Huyen Bridge in Vietnam.
Constructing an artificial island with GEOTUBE
For constructing the edge levees that formed the temporary platform, GEOTUBE GT1000 was chosen.
Protecting shorelines from erosion in Lake McConaughy, Nebraska
GEOTUBE TC1200MB units were selected to provide erosion control because they can be filled using on site materials, making them a more efficient solution than importing stone.
Containment for hazardous waste disposal at Jinchang City
Solmax was chosen to supply a high-grade, multi-layer solution comprised of 1.00 mm GSE HD and 2.00 mm GSE HD conductive geomembrane, each spanning an area of 25,700 m² (276,600 f²).
Lining a tailings facility on the roof of the world
Solmax geomembranes were used to line the tailings facilities of the recently expanded Yulong Copper Mine. The mine located in the Qinghai-Tibet Plateau, on one of the largest copper deposits in China, is important to the economy of the region.
Increasing wastewater treatment capacity to serve a growing town
The Municipality of Tweed is located in central-eastern Ontario. In 2019, the Municipality identified that the existing wastewater treatment system was nearing its rated capacity.