>
Case studies
Installed 113,000 m² of 2.0 mm GSE® HD geomembrane at a nationally regulated power plant coal ash handling facility in Indonesia, delivering long-term containment, zero leakage incidents, and full environmental compliance.
The project involved upgrading an old, aerated sewage lagoon into a modern enclosed underground sewage treatment facility.
The GEOTUBE dewatering containers were used to contain the dredged slurry and remove water from the material, achieving a consistency similar to compacted borrowed material.