Infrastructure developments in South East Asia often involve construction on soft soils, which present significant challenges. Pulau Indah in Malaysia, where Westport is located, has a subsoil consisting of very soft marine clay. The project required a stable load supporting platform for container handling and storage.
The demand for container handling and storage increased, necessitating the construction of additional load supporting platform areas. However, the soft marine clay profile made the initial platform construction challenging and costly. To create a stable platform, 1 meter (3.28 feet) of base course material was used.
The platform at Westport Pulau Indah was reconstructed using the MIRAFI® HP380a subgrade stabilization geotextile. This geotextile was placed between the soft subgrade and a reduced base course thickness of 500 millimeters (19.69 inches). The MIRAFI HP380a geotextile provided reinforcement, base course confinement, separation, and permeability, resulting in a stable load supporting platform. This solution offered cost savings for the client.
The subgrade was prepared by leveling and smoothing the surface. The MIRAFI HP380a geotextile was then placed flat and tightly without folds or wrinkles on the prepared subgrade. Adjacent rolls were joined by overlapping. The aggregate fill was placed in loose lifts of 200 to 300 mm (7.87 to 11.81 in) over the geotextile. The fill was dumped from the edge and spread outward. Finally, the aggregate fill was compacted according to project requirements.
The use of geosynthetics, such as the MIRAFI HP380a geotextile, has been proven to enhance the performance of roads and load support structures. In the Westport Pulau Indah project, the adoption of the MIRAFI HP380a geotextile with a reduced base course thickness of 500 mm (19.69 in) provided a stable load supporting platform for container handling and storage. This geotextile offered reinforcement, base course confinement, separation, and permeability, effectively improving subgrade stabilization. The solution proved to be cost-effective compared to the initial construction without geotextile, which was both expensive and unsatisfactory.

ENTERTAINMENT CITY, PARANAQUE, PHILIPPINES

CONTAINER YARD, KLANG, MALAYSIA
CONTAINER YARD, KLANG, MALAYSIA
Flood protection for Reinland Drain in Manitoba
PROPEX® Armormax® stabilized the eroded Reinland Drain, reducing costs and emissions while ensuring long-term flood protection with reinforced vegetation growth.
Comprehensive containment and capping at Thailand’s ESBEC landfill
Solmax supplied GSE® HD liners and BENTOLINER® GCLs to line and cap Thailand’s ESBEC landfill, ensuring full containment, leachate and gas control, and compliance with national and international waste standards.
Providing a stabilized platform for site development in soft soil and flood-prone areas: an alternative to traditional stabilization methods
MIRAFI® RS580i stabilized parking areas at Knapheide’s Moncks Corner facility over soft, floodplain-adjacent soils, enabling rapid construction, eliminating chemical treatment, reducing material haulage, and delivering durable performance under heavy vehicle loading.