Managing differential settlement on soft landfill soils with MIRAFI
MIRAFI® RS380i stabilized pavements at FLETC Charleston over soft marine clays and landfill soils, reducing settlement risk while improving constructability and lowering costs.

In 2019, Edgewood Middle School underwent renovations and expansion, including the construction of a new parking lot. To utilize the available property, a wall was needed to create a level surface area for the parking lot.
PROPEX® Pyrawall®, an engineered wrap-face vegetated solution for constructing reinforced-soil walls and steepened slopes, was selected to reach the desired grade. Initially a modular block wall was considered, but PROPEX Pyrawall was selected because it was a more cost effective and environmentally friendly solution.
Eight, one foot, PROPEX Pyrawall lifts were constructed to raise the grade for the new parking lot. The wall was fully vegetated within four months of construction, and now blends with the current landscape.

Edgewood Middle School, Minnesota Slope stabilization PROPEX Pyrawall

Edgewood Middle School, Minnesota Slope stabilization PROPEX Pyrawall

Edgewood Middle School, Minnesota Slope stabilization PROPEX Pyrawall
Managing differential settlement on soft landfill soils with MIRAFI
MIRAFI® RS380i stabilized pavements at FLETC Charleston over soft marine clays and landfill soils, reducing settlement risk while improving constructability and lowering costs.
Geosynthetic reinforcement enables vertical landfill expansion on soft soils
Cherry Island Landfill needed more disposal capacity on a constrained site underlain by weak, compressible soils. Solmax geosynthetic reinforcement helped make vertical expansion possible and delivered more than 20 years of additional disposal life.
Texas retailer chooses modern engineering solutions
A Texas fast-food build used FABRINET® TP instead of aggregate for subsurface drainage. The solution reduced excavation, cut costs by 54 percent, sped up installation, and minimized environmental disruption.