Building resilience under extreme wheel loads at ThermoBond’s South Dakota facility
ThermoBond’s Brandon facility uses MIRAFI RS580i to support 46,000 lb wheel loads, reducing aggregate by 35% and delivering durable, cost-efficient performance.

Bornhausen Landfill is in Seesen, a town in the district of Goslar, in Lower Saxony, Germany.
Solmax installed 150,000 m² (1.6 million ft²) of geosynthetics as part Kreiswirtschaftsbetriebe KWB Goslar’s groundwater protection landfill project. The landfill is Class II covering an area of 7.5 hectares with a gradient of up to 1:3. This geosynthetic layer helps to protect the surrounding environment. Waterproofing work began in March 2021 and was completed in June 2022.
The landfill is situated in the Harz Mountains, which experiences unpredictable and sudden rain showers that made the installation difficult. The geography of the area is also challenging because of long, steep slopes up to 120 m (394 ft) long. The installation team needed to work efficiently to make sure the geomembranes were not installed during rain.
Despite the unfavorable weather conditions and geometry, a total of 150,000 m² (1.6 million ft²) of geosynthetics were laid on the construction site in 2021.
Solmax supplied and installed GSE® HD with BAM-certification, 2,5 mm (1 mil) and FABRINET® with BAM-certification, which provides increased durability for filtration and drainage, and is suitable for a variety of field conditions and thickness requirements. The installation team consisted of one senior welding technician and two welding technicians plus additional helpers.

BORNHAUSEN LANDFILL, GERMANY

BORNHAUSEN LANDFILL, GERMANY
Building resilience under extreme wheel loads at ThermoBond’s South Dakota facility
ThermoBond’s Brandon facility uses MIRAFI RS580i to support 46,000 lb wheel loads, reducing aggregate by 35% and delivering durable, cost-efficient performance.
Innovative levee armoring balances flood control and conservation
Florida’s Indian Trail Improvement District levee was reinforced with 66,000 yd² of PROPEX Armormax and custom burrito-wrap structures, delivering long-term flood protection while supporting endangered species habitats.
Integrating geotextile reinforcement and erosion control at Claxton Field
Claxton Field in Needham, MA, was renovated using MIRAFI® RS380i for subgrade stabilization and PROPEX® Armormax for slope protection, ensuring long-term performance and environmental compliance.