Efficient bridge abutment with a mechanically stabilized earth wall using MIRAFI
Overview
The NLEX-Ciudad de Victoria Interchange project aimed to improve mobility and accessibility in Bulacan, connecting Bocaue, Sta. Maria, Pandi, Norzagaray, Angat, and nearby towns. The bridge abutment construction had to be completed within a tight deadline of less than 10 months, and the challenge was that the abutment needed to be built on soft foundation soil.
Challenge
Design & Construction:
To meet these requirements, the chosen design for the project was a Mechanically Stabilized Earth Wall using MIRAFI® Polyfelt PEC Series composite geotextile. This system allowed the use of on-site soil backfill, as the composite geotextile had excellent drainage properties and could reinforce finer-grained soils. The installation process was straightforward, involving laying the geotextile horizontally on the prepared surface with slight tensioning, followed by placing and compacting the backfill soil.
Solution
The Mechanically Stabilized Earth Wall system proved to be the preferred choice for both designers and contractors. Its advantages included an easy and rapid construction technique, superior performance properties of the geocomposite, and cost-effectiveness.
Please note that imperial conversions for measurements were not provided in the original text, so no conversions are needed in this case.

NLEX-CIUDAD DE VICTORIA INTERCHANGE, BULACAN, PHILIPPINES

NLEX-CIUDAD DE VICTORIA INTERCHANGE, BULACAN, PHILIPPINES

NLEX-CIUDAD DE VICTORIA INTERCHANGE, BULACAN, PHILIPPINES

NLEX-CIUDAD DE VICTORIA INTERCHANGE, BULACAN, PHILIPPINES
Explore more case studies
View allStabilizing soft clay soils and shallow utilities during the reconstruction of Main Street
Main Street in Palisade, CO, was reconstructed using geosynthetics to address soft soils and shallow utilities, reducing excavation and aggregate use.

MIRAFI geotextiles optimize stability and reduce costs at Cargill’s Regina facility
Cargill's Regina facility used MIRAFI H2Ri to stabilize expansive, frost-susceptible soils, reducing sub-ballast thickness by 55% and road construction costs by 20%.
MSE pile-supported embankment with MIRAGRID 8X
The I-15 CORE Project in Provo, Utah, used a pile-supported embankment with MIRAGRID 8XT geogrid to stabilize soft soils and meet seismic and space constraints.