Challenge
The Clark International Airport in the Clark Freeport Zone is making progress in the aviation industry with its modern passenger terminals. It serves as a northern gateway and an alternative to the main airport in Metro Manila.
As part of the project, an artificial waterway is being created to collect water runoff within the airport. However, the abundance of lahars (thick debris slurry) in the area poses a significant concern for erosion in the waterway. To address this, a revetment structure is needed for erosion protection.
Solution
To protect against slope erosion, we proposed using GEOTUBE® SFM for the waterway section. This solution offers excellent robustness, abrasion resistance, and durability. A special substrate integrated into the upper surface of the sand-filled mattress promotes rapid vegetation growth, ensuring long-term vegetation cover.
Before installation, a layer of Polyfelt® TS 60 non-woven geotextile is placed on the slope to separate and prevent scouring during hydraulic filling of the sand-filled mattress.
The GEOTUBE SFM rolls are then laid on the slope, running parallel in tubular sections with a 1:1 slope (45-degree angle). The mattresses are hydraulically filled with sand through top openings. A small hopper is used to introduce the sand, which is washed down with water. Adjacent rolls are joined by seaming on-site.
Finally, the sand-filled mattresses are anchored in a trench at the top of the slope.
Result
The GEOTUBE SFM serves as revetment for the entire waterway network at the new Clark Airport Terminal.
The rolls are easy to transport, and installation is quick and straightforward, requiring simple equipment. Skilled labor is not necessary. This erosion protection solution offers long-term effectiveness due to its high robustness, durability, abrasion resistance, and UV resistance. A site revisit showed significant growth of natural vegetation covering the sand-filled mattresses.
Photo credit: Bases Conversion and Development Authority.

Clarke Intl. Airport Terminal Australia Airports GEOTUBE

Clarke Intl. Airport Terminal Australia Airports GEOTUBE

Clarke Intl. Airport Terminal Australia Airports GEOTUBE
More case studies
View all
Providing long term stabilization for drainage channel
PROPEX Armormax and PROPEX Pyramattress, an engineered mattress system that uses PROPEX Pyramat 75 HPTRM to construct a geosynthetic/soil/rock composite for protection of channels, slopes, and spillways.

Steep slope stabilization at SR-11 KYTC DISTRICT 10
The PROPEX Armormax system helped KYTC meet their goal of providing a safe, efficient, environmentally sound and fiscally responsible option to repair the slope while also ensuring access to the state park and economic growth in the surrounding area.

Providing levee resilience and durability
Full scale installation of the EEAS began in 2015 and has since been installed on over 100 miles of earthen levees in the New Orleans area. Since installation, multiple levees have experienced overtopping from major hurricanes, but have not breeched.