Accelerated soft foundation consolidation with Alidrain PVD, Region III, Philippines
Overview
The Central Luzon Link Expressway (CLLEx) is currently being constructed in the Central Luzon region of the Philippines. It will connect the Subic–Clark–Tarlac Expressway (SCTEx) and Tarlac-Pangasinan-La Union Expressway (TPLEx) to the North Luzon East Expressway, which is under construction in Cabanatuan, heading towards San Jose, Nueva Ecija.
The project aims to provide faster access from Metro Manila to Cabanatuan City, which serves as the hub city for Pacific Ocean Coastal Area Development. Additionally, it will alleviate traffic congestion on the Pan-Philippine Highway (Daang Maharlika).
The soil conditions in the area where the expressway will be built consist of soft clay foundations. The natural consolidation process for surcharge loading is excessively time-consuming, and there is a significant concern regarding foundation instability.
Challenge
Alidrain® Prefabricated Vertical Drains (PVDs) have been selected to address the consolidation of soft soil in this expressway project. By using Alidrain PVDs, the settlement of soft clay foundation layers is accelerated, and the undrained shear strength of the soft clay foundation is increased. These improvements enhance the stability of the soft clay material.
Solution
The initial phase of the project involved installing Alidrain PVDs. This process began by constructing a stable working platform on top of the soft clay foundation. Then, the Alidrain PVDs were installed by vertically vibrating a hollow steel mandrel containing the prefabricated vertical drains into the soft clay foundation. The spacing between the drains was 1 m2 (10.76 ft2). The installation depth ranged from 2 to 7.5 m2 (6.56 to 24.61 ft2), depending on the thickness of the soft clay foundation.
The use of Alidrain PVDs significantly reduced consolidation time and improved the stability of the soft clay foundation.
CENTRAL LUZON LINK EXPRESSWAY, PHILIPPINES 3
CENTRAL LUZON LINK EXPRESSWAY, PHILIPPINES

CENTRAL LUZON LINK EXPRESSWAY, PHILIPPINES
More case studies
View all
Providing long term stabilization for drainage channel
PROPEX Armormax and PROPEX Pyramattress, an engineered mattress system that uses PROPEX Pyramat 75 HPTRM to construct a geosynthetic/soil/rock composite for protection of channels, slopes, and spillways.

Steep slope stabilization at SR-11 KYTC DISTRICT 10
The PROPEX Armormax system helped KYTC meet their goal of providing a safe, efficient, environmentally sound and fiscally responsible option to repair the slope while also ensuring access to the state park and economic growth in the surrounding area.

Providing levee resilience and durability
Full scale installation of the EEAS began in 2015 and has since been installed on over 100 miles of earthen levees in the New Orleans area. Since installation, multiple levees have experienced overtopping from major hurricanes, but have not breeched.