Comprised of five distinct branches, Kentucky Transportation Cabinet (KYTC) Maintenance Division has a common goal of maintaining a safe, efficient, environmentally sound, and fiscally responsible transportation system to ensure mobility and access and to promote economic growth for all citizens of the Commonwealth. The Roadway Maintenance Branch conducts roadway maintenance which includes the repair and stabilization of small slips and slides.
In 2020, KYTC created Master Agreements (MA) for the use of an engineered earth armoring solution (EEAS) as an alternative to rock to repair slips and slides.
In 2022, KYTC chose to use the EEAS Type 3 system setup within the MA to stabilize a slope on SR-11. PROPEX® Armormax® consisting of PROPEX Pyramat® 75 HPTRM and nine-foot Type B2 anchors on a 122 cm x 122 cm (4 ft x 4 ft) spacing, met the KYTC EEAS Type 3 specifications. Permanent seeding was placed beneath the HPTRM and has begun to vegetate and blend into the natural surroundings of the state park.
The PROPEX Armormax system helped KYTC meet their goal of providing a safe, efficient, environmentally sound and fiscally responsible option to repair the slope while also ensuring access to the state park and economic growth in the surrounding area. Solmax personnel provided on-site training and construction support to the contractor and KTYC Maintenance personnel.

Steep slope stabilization at SR-11 KYTC DISTRICT 10

Steep slope stabilization at SR-11 KYTC DISTRICT 10

Steep slope stabilization at SR-11 KYTC DISTRICT 10
Protecting groundwater at E4 highway expansion with geomembranes
Solmax supplied 185,000 m² of GSE® HD geomembrane to line runoff ditches along the E4 at Ljungby, protecting groundwater that provides drinking water for 70,000 residents.
Rooftop waterproofing with GSE under height and weather constraints
GSE HD geomembrane formed a durable roof barrier for a green roof system, providing long-term waterproofing under rooftop installation constraints and tropical weather conditions across 6,720 m².
Accelerating large-scale TSF lining supply ahead of the rainy season at Boto mine
Solmax delivered the complete geosynthetic lining system for the Boto gold mine TSF, coordinating materials and sequencing to meet tight construction timelines ahead of seasonal weather constraints.