Stabilizing soft agricultural land for heavy crane loads
Solmax supplied 32,500 m² of MIRAFI HMi to stabilize soft agricultural land for crane use, completing winter installation on schedule in four weeks.
>
ÖBB, Austrian Federal Railways, a leader in the mobility and transportation sector in Austria, embarked on a significant endeavour to expand a hydroelectric power station. Because of its location, the intake structure of the power station needed an avalanche protection bund at Tauernmoossee, an artificial lake nestled in the central Alps of Salzburg, Austria. Situated more than 2,000 m above sea level, this lake boasts a volume exceeding 20 million m3 of water, feeding the hydroelectric powerplant. The project called for the construction of a 6m high and a 100m long combined avalanche deflection and catchment dam, purposed to shield the intake structure of the by-pass.
Given the elevation of the site, the project had a restrictive timeframe of just two months, making early completion paramount due to the onset of winter. Throughout the design process, collaborations were forged with the owner, the designer, and the contractor. The design chosen was influenced by construction costs, availability of resources, and a design proposal put forth by Solmax. The elevated terrain posed significant challenges, chiefly the early arrival of winter. Addressing these challenges demanded strategic solutions. Leveraging delivery from stock and incorporating flexibility in design were key in manoeuvring these challenges. A distinctive feature of this project was the decision to opt for a geogrid reinforced structure, facilitated by the quick and easy construction process.
Solmax supplied the Polyslope S system consisting of MIRAGRID® GX 55, MIRAGRID Green, steel shuttering elements and locally available fill material. This system was used because it is an approved and certified reinforced soil system, coupled with its availability and the design assistance that came with it. The result was the successful protection of the vast water reservoir.
Construction crews work diligently on the avalanche protection bund at over 2,000 meters above sea level, preparing the structure before the onset of winter
The installation of Solmax's Polyslope S system, reinforced with MIRAGRID® GX 55, provides structural integrity to the combined deflection and catchment dam
Workers construct the 6-meter high, 100-meter long avalanche protection bund at Tauernmoossee, ensuring the intake structure is shielded from potential avalanches
The use of a geogrid reinforced structure with Solmax's Polyslope S system and MIRAGRID® GX 55 demonstrates advanced engineering solutions in creating a resilient avalanche protection dam
Stabilizing soft agricultural land for heavy crane loads
Solmax supplied 32,500 m² of MIRAFI HMi to stabilize soft agricultural land for crane use, completing winter installation on schedule in four weeks.
Resilient rural road construction in Thailand using MIRAFI H2Rx geotextile
A rural road in Thailand was upgraded using MIRAFI H2Rx geotextile to reinforce soft clay subgrade and manage high groundwater, ensuring durability, reduced moisture, and uninterrupted community access during construction.
Strengthening canal-adjacent road infrastructure in Thailand with MIRAFI H2Rx
MIRAFI H2Rx geotextile was installed over 27,000 m² to reinforce a road near Maharahj canal, improving pavement strength and moisture control while preventing embankment failure and completing 3 km in just 5 days.