Transforming coal mine settling ponds with GEOTUBE dewatering
Overview
A large Indonesian mining corporation faced a challenge in dewatering silt sediments from their settling ponds in South Kalimantan, Indonesia. The ponds had reached their capacity, and the company had limited available land space. The cleaning process involved a continuous cycle of silt dredging and truck relocation to prevent runoff with high levels of suspended solids from polluting nearby river channels. However, this approach became too costly.
Challenge
To address the issue, the company implemented a GEOTUBE® dewatering facility as part of their cleanout efforts. Over 300 GEOTUBE units were utilized to dewater more than 1,000,000 m³ (1,307,950 yd³) of sediments annually, containing 170,000 m³ (222,411 yd³) of dry solids. The GEOTUBE dewatering tubes were stacked up to seven layers high, using standardized units with a circumference of 36.6 meters (120 feet) and lengths up to 61.4 meters (201 feet), to create large solid landfill structures and optimize land space.
This project stands as one of the largest GEOTUBE dewatering projects ever undertaken worldwide, providing valuable insights into the economics of large-scale GEOTUBE dewatering. It has recently received the 2021 International Achievement Award (IAA) - Award of Excellence.

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE
More case studies
View all
Providing long term stabilization for drainage channel
PROPEX Armormax and PROPEX Pyramattress, an engineered mattress system that uses PROPEX Pyramat 75 HPTRM to construct a geosynthetic/soil/rock composite for protection of channels, slopes, and spillways.

Steep slope stabilization at SR-11 KYTC DISTRICT 10
The PROPEX Armormax system helped KYTC meet their goal of providing a safe, efficient, environmentally sound and fiscally responsible option to repair the slope while also ensuring access to the state park and economic growth in the surrounding area.

Providing levee resilience and durability
Full scale installation of the EEAS began in 2015 and has since been installed on over 100 miles of earthen levees in the New Orleans area. Since installation, multiple levees have experienced overtopping from major hurricanes, but have not breeched.