Slope failure repair using MIRAFI Polyfelt PEC: Langkawi, Malaysia
Overview
Continuous rainfall caused a major landslide on the Federal Route leading to Langkawi's highest mountain (881m/2,890 ft). This area houses a museum, a park, and a satellite control centre. The landslide severely disrupted traffic and posed risks to road users.
Challenge
The high, steep, and unstable failed slope made it difficult to trim it into a gentler gradient using conventional methods. After considering various solutions, PWD engineers decided to realign the road, moving it 30m (98 ft) away from the failed slope. This required constructing a geosynthetics reinforced slope starting from the toe of the failed area below the road.
Since there was no granular material available at the site, the design focused on using the fine sandy soil already present as backfill. MIRAFI® Polyfelt PEC reinforcement geotextile was chosen due to its high tensile strength, optimal reinforcement/soil friction interface, and effective in-plane drainage in such soils.
Solution
The reinforced soil structure consisted of a 30m-high (98 ft) slope reinforced from the toe of the failed embankment. The facing system used involved wrapping a net around bags filled with fine-grained soil. This construction method allowed for the practical creation of a curved slope. MIRAFI Polyfelt PEC was placed behind the gabion and soil bags to enhance the structure's strength. Additionally, a layer of MIRAFI Polyfelt PEC TS geotextile filter was installed behind the gabions to prevent soil piping through the voids.
The primary reinforcement direction of MIRAFI Polyfelt PEC was perpendicular to the slope's surface. The reinforcement geotextile was pretensioned and secured with wooden pegs. Backfill material was compacted using a 10-ton compactor to achieve a minimum of 90% proctor compaction. Finally, hydroseeding was performed to establish vegetation on the completed slope.

Slope failure repair using MIRAFI Polyfelt PEC: Langkawi, Malaysia

Slope failure repair using MIRAFI Polyfelt PEC: Langkawi, Malaysia
More case studies
View all
Providing long term stabilization for drainage channel
PROPEX Armormax and PROPEX Pyramattress, an engineered mattress system that uses PROPEX Pyramat 75 HPTRM to construct a geosynthetic/soil/rock composite for protection of channels, slopes, and spillways.

Steep slope stabilization at SR-11 KYTC DISTRICT 10
The PROPEX Armormax system helped KYTC meet their goal of providing a safe, efficient, environmentally sound and fiscally responsible option to repair the slope while also ensuring access to the state park and economic growth in the surrounding area.

Providing levee resilience and durability
Full scale installation of the EEAS began in 2015 and has since been installed on over 100 miles of earthen levees in the New Orleans area. Since installation, multiple levees have experienced overtopping from major hurricanes, but have not breeched.