Stabilizing the Des Moines River with PROPEX
Overview
The west fork of the Des Moines River in Palo Alto County, had experienced years of erosion and flooding. From 2006 to 2019, the riverbank had receded up to 215 feet in the middle of the bend. Approximately three acres of soil had been lost during that time, and the receding shoreline was approaching an existing roadway. The historic Kirby-Flynn Bridge was also in jeopardy of approaching waters. This bridge is the only remaining pin-connected Pratt high-truss bridge in the United States, and dates back to 1881.
Challenge
The Sioux City Natural Resource Conservation Service (NRCS) wanted to stabilize approximately 264 m (865 ft) of the bank, and reinstate channel alignment to what it was in 2006. Initially the project engineer considered using rock riprap, but wanted to find a more cost effective solution.
Solution
A combination of PROPEX® Scourlok® and PROPEX Armormax® was selected because it provided long-term protection from erosion, promoted reinforced vegetation, and helped improve water quality at a lower cost than rock. Both systems are designed to resist extreme hydraulic stresses and can withstand wave action.
The design included two rows of PROPEX Scourlok along the 2006 channel alignment with a benched area protected by PROPEX Armormax to the current bank condition. Additionally, an upper wall section with one row of PROPEX Scourlok was installed to protect the current bank location.

Des Moines River, Florida Flood mitigation PROPEX Armormax and PROPEX Scourlok

Des Moines River, Florida Flood mitigation PROPEX Armormax and PROPEX Scourlok

Des Moines River, Florida Flood mitigation PROPEX Armormax and PROPEX Scourlok

Des Moines River, Florida Flood mitigation PROPEX Armormax and PROPEX Scourlok
More case studies
View all
Providing long term stabilization for drainage channel
PROPEX Armormax and PROPEX Pyramattress, an engineered mattress system that uses PROPEX Pyramat 75 HPTRM to construct a geosynthetic/soil/rock composite for protection of channels, slopes, and spillways.

Steep slope stabilization at SR-11 KYTC DISTRICT 10
The PROPEX Armormax system helped KYTC meet their goal of providing a safe, efficient, environmentally sound and fiscally responsible option to repair the slope while also ensuring access to the state park and economic growth in the surrounding area.

Providing levee resilience and durability
Full scale installation of the EEAS began in 2015 and has since been installed on over 100 miles of earthen levees in the New Orleans area. Since installation, multiple levees have experienced overtopping from major hurricanes, but have not breeched.