The west fork of the Des Moines River in Palo Alto County, had experienced years of erosion and flooding. From 2006 to 2019, the riverbank had receded up to 215 feet in the middle of the bend. Approximately three acres of soil had been lost during that time, and the receding shoreline was approaching an existing roadway. The historic Kirby-Flynn Bridge was also in jeopardy of approaching waters. This bridge is the only remaining pin-connected Pratt high-truss bridge in the United States, and dates back to 1881.
The Sioux City Natural Resource Conservation Service (NRCS) wanted to stabilize approximately 264 m (865 ft) of the bank, and reinstate channel alignment to what it was in 2006. Initially the project engineer considered using rock riprap, but wanted to find a more cost effective solution.
A combination of PROPEX® Scourlok® and PROPEX Armormax® was selected because it provided long-term protection from erosion, promoted reinforced vegetation, and helped improve water quality at a lower cost than rock. Both systems are designed to resist extreme hydraulic stresses and can withstand wave action.
The design included two rows of PROPEX Scourlok along the 2006 channel alignment with a benched area protected by PROPEX Armormax to the current bank condition. Additionally, an upper wall section with one row of PROPEX Scourlok was installed to protect the current bank location.




Rebuilding resilience: post-wildfire erosion control on Pacific Palisades bluff
A homeowner used PROPEX Armormax to protect a bluff damaged by the Pacific Palisades fire to reduce erosion risk, support revegetation and mitigate future wildfires.
Seawall construction, Brisbane Port expansion, QLD, Australia
The Port of Brisbane expanded by constructing a reinforced seawall to enable 230 ha of land reclamation using dredged materials while managing soft clay foundations and protecting the Moreton Bay Marine Park.
High speed railway embankment over karst foundation, Guizhou Province, China
The Anshun–Liupanshui high-speed railway crosses challenging karst terrain in Guizhou Province. Two layers of MIRAFI PET600 geotextile reinforcement were installed at the embankment base to limit deformation and manage subsidence risk under strict settlement criteria.