Dredging the Schwarze Elster River with GEOTUBE
Discover how GEOTUBE® dewatering systems helped manage 10,000 m³ of sediment from the Schwarze Elster River, delivering an effective dewatering, containment and cost-effective solution.


Lining a tailings facility on the roof of the world

Lining a tailings facility on the roof of the world
Dredging the Schwarze Elster River with GEOTUBE
Discover how GEOTUBE® dewatering systems helped manage 10,000 m³ of sediment from the Schwarze Elster River, delivering an effective dewatering, containment and cost-effective solution.
Omega Mine extends AMD treatment capacity with dewatering
At Omega Mine in West Virginia, GEOTUBE® GT500 units help the West Virginia Department of Environmental Protection treat and dewater acid mine drainage from abandoned mines while supporting long-term capacity and compliance.
Dredging and reuse of contaminated sediments
Embraport used dewatered contaminated sediments as structural fill within its terminal platform, saving 400,000 m3 of imported material and reducing earthfill platform costs by 20% to 30%.
Solmax geomembranes were used to line the tailings facilities of the recently expanded Yulong Copper Mine. The mine located in the Qinghai-Tibet Plateau, on one of the largest copper deposits in China, is important to the economy of the region.
The mine is located in some of the highest elevations in the world. The Qinghai-Tibet Plateau has an average altitude of 4,700 m (15,400 ft). The area experiences extreme weather conditions where rain and snowstorms continue for days on end and the UV radiation intensity is high all year round. The extreme conditions make construction difficult and pose challenges to organizing labor resources.
The project needed to recruit technical and labor personnel from Sichuan and Tibet through multiple channels. Bulk material procurement was organized in Chengdu and Xining. The project had high requirements for the on-site living quarters of production service providers and construction personnel. It was also important to find logistics providers with sufficient experience in working in remote and harsh environments ensure timely and sufficient supply of construction materials.
Due to the harsh environment placing restraints on construction, the timelines for this project were tight. The mining waste containment project was an important construction link. The project required a large quantity of high-quality HDPE geomembrane materials. These materials needed to be durable and able to be safely installed. Because the project was a key construction project of the region, it was important to select a geomembrane manufacturer with a global well-known brand, good business reputation and sufficient production capacity.
In 2019, Solmax was selected to supply impervious geomembrane for the project because of its excellent and stable performance and good brand reputation. Solmax has supplied more than 270,000 m² (2.9 million ft²) for this project, including more than 180,000 m² (1.9 million ft²) of 1.5 mm smooth HDPE geomembrane and more than 90,000 m² (970,000 ft²) of 1.5 mm single-side GSE® HD geomembrane for lining the waste dump, intercepting reservoir, retaining dam and reservoir area anti-seepage system.