Dredging the Schwarze Elster River with GEOTUBE
Discover how GEOTUBE® dewatering systems helped manage 10,000 m³ of sediment from the Schwarze Elster River, delivering an effective dewatering, containment and cost-effective solution.

Coastal protection project featuring GEOTUBE systems at La Croisette beach in Cannes.
Coastal protection project featuring GEOTUBE systems at La Croisette beach in Cannes.
Dredging the Schwarze Elster River with GEOTUBE
Discover how GEOTUBE® dewatering systems helped manage 10,000 m³ of sediment from the Schwarze Elster River, delivering an effective dewatering, containment and cost-effective solution.
Omega Mine extends AMD treatment capacity with dewatering
At Omega Mine in West Virginia, GEOTUBE® GT500 units help the West Virginia Department of Environmental Protection treat and dewater acid mine drainage from abandoned mines while supporting long-term capacity and compliance.
Dredging and reuse of contaminated sediments
Embraport used dewatered contaminated sediments as structural fill within its terminal platform, saving 400,000 m3 of imported material and reducing earthfill platform costs by 20% to 30%.
The City of Cannes, known worldwide for its luxurious beaches and the illustrious Cannes Film Festival, undertook an initiative to bolster the resilience of its iconic La Croisette beach. Facing erosion due to aggressive wave actions and its adverse impact on shoreline establishments, particularly the multitude of restaurants, there was a pressing need for a durable solution that would not only aid the restaurant owners by minimizing disruptions during high tides and waves but also enhance beachgoers' experiences, by ensuring a safer and more enjoyable environment.
The project required the construction of four submerged breakwaters, strategically positioned to be invisible from the beach, yet strong enough to absorb the brunt of wave energy. Given the significance of the Cannes Film Festival, the project had explicit instructions to be executed either during the spring or the autumn to avoid disrupting the event. The entire execution phase spanned 18 weeks (about 4 months).
Implementing this project required meticulous planning and impeccable execution. The contractor, Trasomar, commenced by installing scour aprons to counter erosion around the submerged breakwater due to wave activities. Following this, the GEOTUBE® systems were integrated. Using a combination of a large pontoon, divers, and a sand pump, one GEOTUBE system was filled daily.
Positioning the breakwater approximately 150 m (492 ft) from the shoreline at a depth of 3.5 m (11.5 ft) was challenging, especially given the wave actions that sometimes escalated to a staggering 2 to 5 m (6.6 to 16.4 ft), mandating work halts. The process of dredging sand from the sea and ensuring continuous flow through a floating 500 m (1,640 ft) dredge line presented its set of challenges.
The products were selected for their strength, 200 x 200 kN/m1 fabric and robust seams. Their UV resilience retaines over 65% strength even after a decade under the sun. The non-woven material was essential for filling the systems with finely graded materials. All GEOTUBE products carry a CE certification, and we maintain rigorous testing standards.
An earlier attempt by a competitor had faltered, resulting in a product lifespan of just a year due to substandard installation and polymer selection. This swayed the City of Cannes to exclusively use GEOTUBE units for the job.
The overarching lesson is the importance of product selection. The submerged breakwaters have remained effective for over a decade, with only minor maintenance required.