>

MIRAFI Geotextiles
Explore the case studies
Explore all case studies
Case studies
Maintaining trafficability over compressible soils during temporary port works
A temporary submersible breakwater at Port-Vendres used MIRAFI® HMi 5 to improve trafficability over compressible soils while reducing granular thickness, supporting preloading and construction traffic during dredging and quay extension works.
Discover more6 February 2026 Case studies
Providing a stabilized platform for site development in soft soil and flood-prone areas: an alternative to traditional stabilization methods
MIRAFI® RS580i stabilized parking areas at Knapheide’s Moncks Corner facility over soft, floodplain-adjacent soils, enabling rapid construction, eliminating chemical treatment, reducing material haulage, and delivering durable performance under heavy vehicle loading.
Discover more
5 February 2026 Case studies
Road stabilization in Converse County with MIRAFI
Converse County, WY stabilized Mormon Canyon Road using 30,000 yd² of MIRAFI® RS380i. The geosynthetic reinforced soft clay soils, resisted wind uplift, improved roadway life, and reduced future maintenance.
Discover more