Rebuilding resilience: post-wildfire erosion control on Pacific Palisades bluff
A homeowner used PROPEX Armormax to protect a bluff damaged by the Pacific Palisades fire to reduce erosion risk, support revegetation and mitigate future wildfires.

Wisconsin Highway 106 (STH-106) underwent reconstruction over a marsh area but soon faced problems with uneven settling. The Jefferson County Highway Department sought a quick reconstruction method that would limit the need to remove large volumes of wet, organic soil while ensuring a stable base for the flexible pavement road. The solution needed to be sturdy enough to prevent uneven settling along the road, maintaining a smooth and ridable surface.
The main challenge was dealing with wet, saturated silt and peat deposits, extending over 30 feet (9.14 m) beneath the existing pavement. The solution involved a robust construction approach using a single layer of MIRAFI® H₂Ri geosynthetic material placed directly on the subgrade. This was followed by a 15-in (38 cm) layer of crushed stone, a layer of MIRAFI BXG110 biaxial geogrid, and another 15-in (38 cm) layer of crushed stone. The MIRAFI H₂Ri reinforcement and moisture management created a "raft"-like platform for the road, improving drainage, particularly during spring thaws and heavy rains.
The Jefferson County Highway Department was satisfied with the installation process. The multi-layer geosynthetic reinforcement provided a strong, stable base, allowing for smooth paving operations. This robust system reduced the need for subgrade removal to just 30 in (76 cm), significantly less than the 5-8 ft (1.52-2.44 m or more) that might have been necessary given the soil conditions. The MIRAFI H₂Ri not only saved costs but also allowed for quicker installation.

The multi-layer geosynthetic reinforcement provided a strong, stable base, allowing for smooth paving operations
Rebuilding resilience: post-wildfire erosion control on Pacific Palisades bluff
A homeowner used PROPEX Armormax to protect a bluff damaged by the Pacific Palisades fire to reduce erosion risk, support revegetation and mitigate future wildfires.
Seawall construction, Brisbane Port expansion, QLD, Australia
The Port of Brisbane expanded by constructing a reinforced seawall to enable 230 ha of land reclamation using dredged materials while managing soft clay foundations and protecting the Moreton Bay Marine Park.
Restoring marine health in the Marmara Sea with GEOTUBE dewatering
Kocaeli Municipality and Türkiye Ministry deployed 3,500 GEOTUBE units to dewater contaminated sludge from Kocaeli Bay, targeting 60% dry solids and supporting Marmara Sea restoration.