HDPE geomembrane liners for Beyondie SOP evaporation ponds
Solmax supplied 1.0 mm GSE HD geomembranes for 4 km² of evaporation ponds at an Australian SOP facility, ensuring brine containment and efficient potash production.
Monarch Dunes is a resort community that offers residents golf, recreation, and a community vineyard. During construction, a drainage channel was installed in the vineyard to convey surface runoff from the housing development to detention storage basins. Due to the steepness of the slope, the amount of flow, and the erodible sandy soils, the channel severely eroded and failed. The developer needed a solution to provide long-term stabilization of the channel.
Initially hard armoring solutions were considered, but the developer wanted a more natural aesthetic. A combination of PROPEX Armormax® and PROPEX Pyramattress, an engineered mattress system that uses PROPEX Pyramat® 75 HPTRM to construct a geosynthetic/soil/rock composite for protection of channels, slopes, and spillways, was selected. The combined system was designed to provide erosion control on the side slopes and scour resistance in the channel bottom caused by the constant flow of water.
Unlike hard armoring technologies, PROPEX Pyramattress components are corrosion resistant and promote vegetation, allowing for an increased design life that is environmentally friendly.
The installation of this project was quick and easy because PROPEX Pyramattress and PROPEX Armormax are more easily transported than hard armoring solutions. The systems also install faster than convention methods, saving time and money.
Nipomo install
Nipomo problem
Nipomo
HDPE geomembrane liners for Beyondie SOP evaporation ponds
Solmax supplied 1.0 mm GSE HD geomembranes for 4 km² of evaporation ponds at an Australian SOP facility, ensuring brine containment and efficient potash production.
Coastal protection project for Communauté du Golfe de Saint-Tropez
GEOTUBE Marine tubes were installed by the Communauté du Golfe de Saint – Tropez to protect 103 km of coastline and the only road to Saint-Tropez. The project reduced wave impact and prevented.
Subgrade stabilization in Santa Ana parking lot with MIRAFI RSi
MIRAFI® RS380i was used in a Santa Ana College parking lot expansion to reduce pavement thickness, avoid utility conflicts, accelerate construction, and improve long-term pavement durability.