In Vojens, Denmark, a 200,000 m³ pit thermal storage basin stores surplus solar heat from a 70,000 m² collector field. Using Solmax geosynthetics, the system reduces CO₂ emissions by 6,000 tons annually.
>
The town of Palisade, located in Mesa County, is known as the peach and wine capital of Colorado. The Town needed to rebuild its Main Street to keep up with the growing diversity and increased traffic load in an expedient and cost-effective manner. During the reconstruction of Main Street, soft soils and shallow utilities were expected to be encountered, creating challenging conditions for construction.
The geotechnical investigation concluded soil characteristics would vary, with the first boring indicating a moist, dense, sandy gravel, and the remainder of the borings indicating a moist, soft to stiff, lean clay. Laboratory testing results indicated that the native clay soils were moderately plastic and tended to consolidate under loading at their existing density. The California Bearing Ratio (CBR) was determined to be less than 2%.
The benefits of utilizing geosynthetic-reduced sections on this project included both time and cost savings. The contractor installed MIRAFI® RSi-Series geotextiles with ease, maintaining a minimum of one foot of overlap. The geosynthetic-reinforced sections provided faster construction due to reduced excavation, less aggregate to transport and install, and not having to excavate into utilities. The expedited construction schedule equated to happier townspeople and shop owners.
Accounting for the reduction in excavation and the reduction of the aggregate section thicknesses, it is estimated that the geosynthetic-reinforced designs provided approximately $60,000 in cost savings. The engineer put his best foot forward in providing cost-saving options to the Town, and the Town put their best foot forward by utilizing the cost-saving designs, which saved taxpayer dollars.
MIRAFI RSi-Series geotextiles were installed with at least one foot of overlap, allowing for reduced excavation and material transport while maintaining stability.
The geosynthetic-reinforced sections enabled faster construction by minimizing excavation into utilities and reducing aggregate use, expediting the overall project timeline.
World’s largest pit thermal storage in Vojens
In Vojens, Denmark, a 200,000 m³ pit thermal storage basin stores surplus solar heat from a 70,000 m² collector field. Using Solmax geosynthetics, the system reduces CO₂ emissions by 6,000 tons annually.
Extending parking lot overlay life at Hillsborough College – Brandon Campus
Hillsborough College – Brandon Campus used Petromat® MPV500 paving fabric to improve bonding, delay reflective cracking, and support longer-lasting pavement rehabilitation.
Reinforced dune construction for shoreline protection in Montauk
USACE stabilized the eroded Montauk shoreline using more than 11,000 GEOTUBE® Geobag sand containers and 3,200 ft of scour aprons to form a reinforced dune core, restoring storm protection for vulnerable commercial buildings.