When a prominent developer and operator of renewable energy storage solutions was building a new solar site in Texas, a solution was needed to stabilize access roads used during installation. Solar farm sites are often located in remote, protected areas or agricultural land, where soil conditions can be less than ideal.
Multiple access roads needed to be constructed to allow heavy machinery and materials to be transported to the construction site. Expansive soils, which can shift and change volume with moisture fluctuation, created challenges in stabilizing these access roads.
After evaluating various options, the engineering team chose a solution involving six in. (15 cm) of flexible base over MIRAFI® RS380i. MIRAFI RSi-Series provides a proven solution for constructing durable, high-performance access roads and platforms in solar farm projects.
Taking the soil conditions into consideration, the required reduced aggregate thickness for road stabilization was determined using the subgrade strength parameters outlined in the Giroud-Han (2004) methodology. This approach provided the necessary reinforcement for the access roads while reducing material costs, shortening the construction timeline, and ensuring long-term durability. Additionally, it minimized environmental impact by conserving resources and reducing CO2 emissions compared to traditional methods.
By utilizing the MIRAFI RS380i system, immediate site access was achieved without the need for excavation and allowed for a thinner base layer, resulting in substantial savings. The Solmax team provided onsite support during installation, visiting the site multiple times to address questions and proper installation criteria.

MIRAFI RS380i placed to reinforce access roads over expansive Texas soils.

Geotextile reinforcement installed to reduce base thickness for solar farm roads.

Access road construction accelerated using MIRAFI RS380i and flexible base

Field crew installing MIRAFI RS380i to improve bearing capacity.

Reduced aggregate layer achieved through Giroud–Han design methodology.
World’s largest pit thermal storage in Vojens
In Vojens, Denmark, a 200,000 m³ pit thermal storage basin stores surplus solar heat from a 70,000 m² collector field. Using Solmax geosynthetics, the system reduces CO₂ emissions by 6,000 tons annually.
Extending parking lot overlay life at Hillsborough College – Brandon Campus
Hillsborough College – Brandon Campus used Petromat® MPV500 paving fabric to improve bonding, delay reflective cracking, and support longer-lasting pavement rehabilitation.
Reinforced dune construction for shoreline protection in Montauk
USACE stabilized the eroded Montauk shoreline using more than 11,000 GEOTUBE® Geobag sand containers and 3,200 ft of scour aprons to form a reinforced dune core, restoring storm protection for vulnerable commercial buildings.