MSE walls with MIRAGRID XT for rail expansion
GO Transit used hybrid MSE walls with MIRAGRID XT geogrids to stabilize embankments on Lakeshore West Line, ensuring stability under space and load constraints.
Wisconsin Highway 106 (STH-106) underwent reconstruction over a marsh area but soon faced problems with uneven settling. The Jefferson County Highway Department sought a quick reconstruction method that would limit the need to remove large volumes of wet, organic soil while ensuring a stable base for the flexible pavement road. The solution needed to be sturdy enough to prevent uneven settling along the road, maintaining a smooth and ridable surface.
The main challenge was dealing with wet, saturated silt and peat deposits, extending over 30 feet (9.14 m) beneath the existing pavement. The solution involved a robust construction approach using a single layer of MIRAFI® H₂Ri geosynthetic material placed directly on the subgrade. This was followed by a 15-in (38 cm) layer of crushed stone, a layer of MIRAFI BXG110 biaxial geogrid, and another 15-in (38 cm) layer of crushed stone. The MIRAFI H₂Ri reinforcement and moisture management created a "raft"-like platform for the road, improving drainage, particularly during spring thaws and heavy rains.
The Jefferson County Highway Department was satisfied with the installation process. The multi-layer geosynthetic reinforcement provided a strong, stable base, allowing for smooth paving operations. This robust system reduced the need for subgrade removal to just 30 in (76 cm), significantly less than the 5-8 ft (1.52-2.44 m or more) that might have been necessary given the soil conditions. The MIRAFI H₂Ri not only saved costs but also allowed for quicker installation.
The multi-layer geosynthetic reinforcement provided a strong, stable base, allowing for smooth paving operations
MSE walls with MIRAGRID XT for rail expansion
GO Transit used hybrid MSE walls with MIRAGRID XT geogrids to stabilize embankments on Lakeshore West Line, ensuring stability under space and load constraints.
MIRAFI geotextiles prevent subgrade failure and reduce track downtime
Canadian Pacific Railway (CP) identified track settlement issues and partnered with Solmax and Clifton Associates to implement a geosynthetic solution, reducing ballast use by 43% and completing repairs on a 72 ft section in under seven hours.
MIRAFI geotextiles optimize stability and reduce costs at Cargill’s Regina facility
Cargill's Regina facility used MIRAFI H2Ri to stabilize expansive, frost-susceptible soils, reducing sub-ballast thickness by 55% and road construction costs by 20%.