As part of Hawaii’s National Pollutant Discharge Elimination System (NPDES) and Erosion Prone Area Improvements Program, a streambank stabilization project was completed along Kaneohe Stream in Kaneohe, Oahu.
Over the past 30 years, high-flow events eroded higher portions of the channel, causing encroachment of several private properties. To prevent additional property loss and mitigate future flooding, the City and County of Honolulu wanted to find a solution that would provide long-term channel stabilization. Historically, a concrete solution has been used, but the City and County wanted a more natural system that encouraged the growth of native vegetation.
PROPEX® Pyrawall engineered wrap-faced vegetated solution, was selected to reinforce 330 feet of Kaneohe Stream. The installation ranged from six to eight feet high and was designed based on geotechnical information available at the site. This included steep 1H:4V slope segments with a midslope planting bench.
PROPEX Pyrawall combines High Performance Turf Reinforcement Mat (HPTRM) with internal braces to reinforce soil mass and resist lateral earth pressures. It is also designed to encourage vegetation and is a vegetated Best Management Practice Solution for NPDES Storm Water Compliance. This wall system is comprised entirely of three engineered geosynthetic components with no metal, concrete or short-lived biodegradable materials.
The vegetated wrap-face wall system provided a resilient bank reconstruction and stabilization along a residential section of the Kaneohe Stream that will provided a flood mitigation for up to 75 years.


Ocala highway stabilization with MIRAFI Rsi
Ocala built a four-lane highway over deep fill in an active mine using a multi-layer MIRAFI RSi geosynthetic system to stabilize weak, saturated soils.
Building resilience under extreme wheel loads at ThermoBond’s South Dakota facility
ThermoBond’s Brandon facility uses MIRAFI RS580i to support 46,000 lb wheel loads, reducing aggregate by 35% and delivering durable, cost-efficient performance.
Innovative levee armoring balances flood control and conservation
Florida’s Indian Trail Improvement District levee was reinforced with 66,000 yd² of PROPEX Armormax and custom burrito-wrap structures, delivering long-term flood protection while supporting endangered species habitats.