The Municipality of Tweed is located in central-eastern Ontario. In 2019, the Municipality identified that the existing wastewater treatment system was nearing its rated capacity. To ensure adequate capacity for future demands and growth in the community, the Municipality needed to expand the wastewater system, which included construction of a third lagoon cell. The project received both federal and provincial funding, including an investment through the Green Infrastructure Stream of the Investing in Canada plan.
Site preparation began in Spring 2021, and approximately 60,000 m³ (2.1 million ft³) of soil was moved to construct the third cell and prepare for the liner system. The liner system was installed as a “sandwich” consisting of a heavy weight nonwoven geotextile on the top and bottom, and 40-mil polyethylene geomembrane in the middle.
Approximately 32,000 m² (344,440 f²) of a hybrid GSE® HD and GSE LL geomembrane manufactured by Solmax was selected to provide excellent UV and chemical resistance, in addition to enhanced endurance properties. To provide a protection barrier for the geomembrane, 62,000 m² (667,360 f²) of MIRAFI® 1160N nonwoven were installed.
To minimize handling and increase installation efficiency, the nonwoven geotextile rolls were factory-sewn with double stitched prayer seams to double-width rolls prior to installation. This also helped to minimize waste. The polyethylene geomembrane liner panels were welded together using a wedge welder, and pipe penetrations were sealed using an extrusion-welding process.
It is estimated that the sewage system’s capacity was expanded by around 50%, which will serve approximately 400 new homes.

Installation of Enviromax liner above 1160N Geotextile – note anchor trench in foreground

Aerial view of site
Ocala highway stabilization with MIRAFI Rsi
Ocala built a four-lane highway over deep fill in an active mine using a multi-layer MIRAFI RSi geosynthetic system to stabilize weak, saturated soils.
Building resilience under extreme wheel loads at ThermoBond’s South Dakota facility
ThermoBond’s Brandon facility uses MIRAFI RS580i to support 46,000 lb wheel loads, reducing aggregate by 35% and delivering durable, cost-efficient performance.
Innovative levee armoring balances flood control and conservation
Florida’s Indian Trail Improvement District levee was reinforced with 66,000 yd² of PROPEX Armormax and custom burrito-wrap structures, delivering long-term flood protection while supporting endangered species habitats.