World’s largest pit thermal storage in Vojens
In Vojens, Denmark, a 200,000 m³ pit thermal storage basin stores surplus solar heat from a 70,000 m² collector field. Using Solmax geosynthetics, the system reduces CO₂ emissions by 6,000 tons annually.
During the construction of a solar farm in Puerto Peñasco, Mexico, trucks consistently became stuck in the sandy, poorly graded soil. To address the low bearing capacity of the ground, a solution was implemented involving the integration of MIRAFI® RS580i geotextile with a 10 in (25 cm) layer of mixed sand and gravel.
MIRAFI RS580i was selected for its high tensile strength and excellent load distribution properties. When combined with the gravel mixture, it significantly improved the soil’s load-bearing capacity, allowing heavy trucks and construction equipment to operate without getting stuck.
Soil excavation and replacement were considered as alternative solutions, but both options were more expensive and time-consuming. In contrast, MIRAFI RS580i provided an efficient and cost-effective way to enhance the existing sandy soil.
The use of geosynthetics also reduced the need for extensive earthwork, which led to additional savings by minimizing equipment and labor demands. Furthermore, by avoiding the removal and replacement of large volumes of native sand, the project reduced waste generation and environmental impact. The geosynthetic solution also supports sustainability by delivering long-term performance while conserving natural resources compared to traditional construction methods.
The integration of MIRAFI RS580i delivered multiple benefits, including improved load-bearing capacity, enhanced site stability, increased durability, cost savings, and a lower environmental footprint. This approach effectively resolved the challenges presented by the site’s sandy soil and supported smooth progress throughout the construction phase.
The geosynthetic layer contributes to long-term stability and durability, safeguarding the solar farm from potential settlement or ground deformation. As a result, the overall lifespan of the project has been extended, making MIRAFI RS580i a critical component in the site’s successful and sustainable development.
Installation of MIRAFI® RS580i beneath a 25 cm gravel layer to stabilize sandy soils at the Puerto Peñasco solar farm site.
Heavy trucks and construction equipment operating safely on stabilized ground reinforced with MIRAFI® RS580i.
Geosynthetic solution reducing excavation needs and improving long-term site performance for sustainable solar farm construction.
World’s largest pit thermal storage in Vojens
In Vojens, Denmark, a 200,000 m³ pit thermal storage basin stores surplus solar heat from a 70,000 m² collector field. Using Solmax geosynthetics, the system reduces CO₂ emissions by 6,000 tons annually.
Extending parking lot overlay life at Hillsborough College – Brandon Campus
Hillsborough College – Brandon Campus used Petromat® MPV500 paving fabric to improve bonding, delay reflective cracking, and support longer-lasting pavement rehabilitation.
Reinforced dune construction for shoreline protection in Montauk
USACE stabilized the eroded Montauk shoreline using more than 11,000 GEOTUBE® Geobag sand containers and 3,200 ft of scour aprons to form a reinforced dune core, restoring storm protection for vulnerable commercial buildings.