Coal mine dump wall, Sangatta, East Kalimantan, Indonesia
A 17.5 m high reinforced soil dump wall was constructed at the Sangatta coal mine to increase material handling capacity while supporting heavy dump truck loads and minimizing earthworks.

A large Indonesian mining corporation faced a challenge in dewatering silt sediments from their settling ponds in South Kalimantan, Indonesia. The ponds had reached their capacity, and the company had limited available land space. The cleaning process involved a continuous cycle of silt dredging and truck relocation to prevent runoff with high levels of suspended solids from polluting nearby river channels. However, this approach became too costly.
To address the issue, the company implemented a GEOTUBE® dewatering facility as part of their cleanout efforts. Over 300 GEOTUBE units were utilized to dewater more than 1,000,000 m³ (1,307,950 yd³) of sediments annually, containing 170,000 m³ (222,411 yd³) of dry solids. The GEOTUBE dewatering tubes were stacked up to seven layers high, using standardized units with a circumference of 36.6 meters (120 feet) and lengths up to 61.4 meters (201 feet), to create large solid landfill structures and optimize land space.
This project stands as one of the largest GEOTUBE dewatering projects ever undertaken worldwide, providing valuable insights into the economics of large-scale GEOTUBE dewatering. It has recently received the 2021 International Achievement Award (IAA) - Award of Excellence.

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE

Coal mine settling ponds South Kalimantan Ponds+Storage GEOTUBE
Coal mine dump wall, Sangatta, East Kalimantan, Indonesia
A 17.5 m high reinforced soil dump wall was constructed at the Sangatta coal mine to increase material handling capacity while supporting heavy dump truck loads and minimizing earthworks.
Comprehensive containment and capping at Thailand’s ESBEC landfill
Solmax supplied GSE® HD liners and BENTOLINER® GCLs to line and cap Thailand’s ESBEC landfill, ensuring full containment, leachate and gas control, and compliance with national and international waste standards.
Electrified double track, Ipoh to Padang Besar, Malaysia
Malaysia upgrades the western railway line with a 330 km electrified double-track project, using ground improvement, geotextile reinforcement, and modern systems to stabilize soft soils and construct new parallel tracks.