Skip to main content
Slope failure repair using MIRAFI Polyfelt PEC: Langkawi, Malaysia
The reinforced soil structure consisted of a 30m-high (98 ft) slope reinforced from the toe of the failed embankment. The facing system used involved wrapping a net around bags filled with fine-grained soil.