Desilting Solutions removed 150,000 m³ of biosolids from sludge lagoons at three operational sewerage treatment plants using GEOTUBE dewatering containers for efficient dewatering.
>
The Central Luzon Link Expressway (CLLEx) is currently being constructed in the Central Luzon region of the Philippines. It will connect the Subic–Clark–Tarlac Expressway (SCTEx) and Tarlac-Pangasinan-La Union Expressway (TPLEx) to the North Luzon East Expressway, which is under construction in Cabanatuan, heading towards San Jose, Nueva Ecija.
The project aims to provide faster access from Metro Manila to Cabanatuan City, which serves as the hub city for Pacific Ocean Coastal Area Development. Additionally, it will alleviate traffic congestion on the Pan-Philippine Highway (Daang Maharlika).
The soil conditions in the area where the expressway will be built consist of soft clay foundations. The natural consolidation process for surcharge loading is excessively time-consuming, and there is a significant concern regarding foundation instability.
Alidrain® Prefabricated Vertical Drains (PVDs) have been selected to address the consolidation of soft soil in this expressway project. By using Alidrain PVDs, the settlement of soft clay foundation layers is accelerated, and the undrained shear strength of the soft clay foundation is increased. These improvements enhance the stability of the soft clay material.
The initial phase of the project involved installing Alidrain PVDs. This process began by constructing a stable working platform on top of the soft clay foundation. Then, the Alidrain PVDs were installed by vertically vibrating a hollow steel mandrel containing the prefabricated vertical drains into the soft clay foundation. The spacing between the drains was 1 m2 (10.76 ft2). The installation depth ranged from 2 to 7.5 m2 (6.56 to 24.61 ft2), depending on the thickness of the soft clay foundation.
The use of Alidrain PVDs significantly reduced consolidation time and improved the stability of the soft clay foundation.
CENTRAL LUZON LINK EXPRESSWAY, PHILIPPINES 3
CENTRAL LUZON LINK EXPRESSWAY, PHILIPPINES
CENTRAL LUZON LINK EXPRESSWAY, PHILIPPINES
Biosolid removal with GEOTUBE dewatering units
Desilting Solutions removed 150,000 m³ of biosolids from sludge lagoons at three operational sewerage treatment plants using GEOTUBE dewatering containers for efficient dewatering.
Creating a recreational pond with GSE geomembrane at Kiki Beach Resort
Kiki Beach Resort on Batam Island installed GSE HD 1.50 mm White Smooth for a recreational pond to enhance visual appeal and durability. The solution included custom roll sizes and a GSE Polylock anchoring system to meet design and site challenges.
Restoration of submerged stormwater pipeline
Desilting Solutions restored a submerged stormwater pipeline in Milton, Queensland, to 97% capacity using GEOTUBE technology and remote dredging within a confined site.