Ocala built a four-lane highway over deep fill in an active mine using a multi-layer MIRAFI RSi geosynthetic system to stabilize weak, saturated soils.

GEOTUBE® dewatering technology is a cost-effective method for removing water from industrial and mineral slurries and sludges. Its flexibility allows for custom solutions to address site-specific challenges and improve operational efficiency.
In this case, GEOTUBE units were used to direct fly ash slurry over specific areas of a tailings storage facility (TSF) during its closure, as part of the closure cap system.
The project faced several challenges. First, the slurry had to be assessed to determine if polymer dosing was necessary. Testing in the Geofabrics Gold Coast laboratory concluded that polymer dosing was unnecessary, and direct discharge from the spigots was feasible.
The second challenge was to determine the optimal type and size of tubes, considering how they would be deployed and pumped to create a bunding channel for directing the fly ash slurry.
The chosen solution involved using GEOTUBE units with dimensions of 9.2 m circumference (30.2 ft) x 61.4 m length (201.8 ft) and 4.4 m circumference (14.4 ft) x 30.6 m length (100.4 ft). The tubes were arranged in a "V" shape, fanning out from the fly ash, to create the discharge bunding. A MIRAFI® Bidim non-woven geotextile and synthetic membrane were placed over the substrate, and the tube units were deployed over the membrane. Marker posts were positioned over the TSF to aid in aligning the tube deployment and visually indicating the depth of the fly ash slurry cover.
The GEOTUBE units were filled directly from the spigots until reaching the predetermined maximum fill heights for the slurry type. They were then allowed to naturally dewater to the calculated consolidated height. Once firm, the fly ash slurry was released over the TSF.
This project demonstrates the versatility of GEOTUBE dewatering technology in addressing mine operational challenges in a practical and cost-effective manner. GEOTUBE units are available in various sizes, with the capacity to hold up to 3,000m³ (105,944 ft³) of dry solids and can be custom fabricated to meet specific site and operational requirements.

Geotube dewatering fly ash pond

Geotube

Pond closure - fly ash
Ocala highway stabilization with MIRAFI Rsi
Ocala built a four-lane highway over deep fill in an active mine using a multi-layer MIRAFI RSi geosynthetic system to stabilize weak, saturated soils.
Building resilience under extreme wheel loads at ThermoBond’s South Dakota facility
ThermoBond’s Brandon facility uses MIRAFI RS580i to support 46,000 lb wheel loads, reducing aggregate by 35% and delivering durable, cost-efficient performance.
Innovative levee armoring balances flood control and conservation
Florida’s Indian Trail Improvement District levee was reinforced with 66,000 yd² of PROPEX Armormax and custom burrito-wrap structures, delivering long-term flood protection while supporting endangered species habitats.