Coal mine dump wall, Sangatta, East Kalimantan, Indonesia
A 17.5 m high reinforced soil dump wall was constructed at the Sangatta coal mine to increase material handling capacity while supporting heavy dump truck loads and minimizing earthworks.
The Davao City coastal road bypass project aims to alleviate traffic congestion in the city by constructing a road from Roxas Avenue to Bago Aplaya, passing through NHA Kadayawan Homes, Matina Aplaya, and Bolton Isla. Three roundabouts will be installed along the 35 km (21.7 mile) coastal stretch at Roxas Avenue, Times Beach area, and Matina Aplaya.
Due to the region's growing population and ongoing development, traffic congestion on major roads has become a significant problem. The coastal road project aimed to address this issue.
In the Bago-Aplaya Section facing Davao Gulf towards Talomo, an elevated highway with a 90-degree vertical slope on both sides, the contractor needed to stabilize and reinforce the embankments effectively.
For this project, a segmental block wall reinforced with MIRAGRID® GX geogrid was chosen. This design offers fast, durable construction. MIRAGRID GX geogrid possesses the necessary properties for long-term reinforcement, including high tensile strength at low elongation, minimal creep, and low installation damage. Its superior interlocking mechanism and connection capacity to block wall systems make it an ideal choice.
Construction:
The reinforced segmental block wall system involved the use of precast concrete blocks arranged to form the wall facing. The soil/sand backfill behind the wall was reinforced with MIRAGRID GX geogrid. The blocks were designed with an interlocking mechanism that securely connected them. The geogrid reinforcement was placed horizontally on the soil backfill and connected to the concrete blocks at specific design heights of the wall.
Performance:
By utilizing MIRAGRID GX, the construction of the reinforced segmental block wall system resulted in a relatively flexible structure capable of accommodating differential settlement without causing damage. The project successfully achieved the goals of stabilization and reinforcement, while also being completed within the designated time and cost parameters.

DAVAO CITY COASTAL ROAD, PHILIPPINES

Coal mine dump wall, Sangatta, East Kalimantan, Indonesia
A 17.5 m high reinforced soil dump wall was constructed at the Sangatta coal mine to increase material handling capacity while supporting heavy dump truck loads and minimizing earthworks.
Comprehensive containment and capping at Thailand’s ESBEC landfill
Solmax supplied GSE® HD liners and BENTOLINER® GCLs to line and cap Thailand’s ESBEC landfill, ensuring full containment, leachate and gas control, and compliance with national and international waste standards.
Electrified double track, Ipoh to Padang Besar, Malaysia
Malaysia upgrades the western railway line with a 330 km electrified double-track project, using ground improvement, geotextile reinforcement, and modern systems to stabilize soft soils and construct new parallel tracks.