The Motiva Brine Pond in southeast Texas supports the storage of butane in underground salt caverns. The pond is about five acres and has been in service for about 15 years. When increased leakage was detected, an inspection of the liner system was initiated.
The liner system, from bottom to top, comprised a subgrade, composite venting layer, secondary liner, geonet, and primary liner. Inspection of the primary liner identified areas where the primary conductive liner was torn away from mechanical attachments. As the other layers were in good condition, US FUSION & Specialty Construction, LLC decided to replace only the primary liner. US FUSION & Specialty Construction, LLC was contracted to install the selected primary liner and perform a certified quality audit (CQA) of the liner by conducting an electric liner integrity (ELI) Spark test. The GSE® HD Leak Location liner, a conductive-backed high-density polyethylene (HDPE) geomembrane which facilitates electric leak location, was selected for the primary liner.
In Texas, if brine ponds exceed the permitted action leakage rate (ALR) due to leaks in the geomembrane, the pond must be removed from service until leaks are repaired and leakage is below the ALR. This made it important for US FUSION & Specialty Construction, LLC to implement a solution that could easily and reliably be tested for leaks using an ELI survey, both during installation and in the future.
At the site, 25,700 m² (277,000 ft²) of 1.5 mm (60 mil), black, smooth GSE Leak Location liner was installed, with Solmax’s S-100 Spark Tester used to perform the bare electrical leak location survey on the floor of the project. A cart electrode was used to ease the performance of the survey. During the CQA spark testing of the primary liner, three holes were found in the geomembrane and were repaired. The pond was put back in service with no leakage observed.

Conduct electric liner integrity survey

Identify and repair three geomembrane holes

Ensure no leakage after repairs are completed.

Replace primary liner due to detected leakage

Install 25,700 m² of geomembrane line

Install GSE HD Leak Location liner

Use Solmax S-100 Spark Tester for inspection
World’s largest pit thermal storage in Vojens
In Vojens, Denmark, a 200,000 m³ pit thermal storage basin stores surplus solar heat from a 70,000 m² collector field. Using Solmax geosynthetics, the system reduces CO₂ emissions by 6,000 tons annually.
Reinforced soil walls maximizing urban developable land
Geocomposite-reinforced soil walls totaling 1,385 m supported land formation at Eco Botanic City, providing stable retaining walls, efficient drainage, and the use of local backfill while maximizing developable land on a constrained urban site.
Reinforcing weak subgrades to restore Weber Road with MIRAFI H2Rx
A deteriorating section of Weber Road was stabilized using MIRAFI® H2Rx geotextile to reinforce soft, moisture-sensitive subgrade soils, improve drainage, reduce deformation, and extend pavement service life.