>
12 June 2024
Case studies
Effective stabilization of fine-grained subgrade soils and the implementation of MIRAFI RS580i led to a new roadway that exceeded performance expectations.
Jefferson County Highway Department successfully reconstructed Wisconsin Highway 106 over marshland, using geosynthetic materials to minimize excavation and ensure a stable, well-drained road surface.
17 April 2024
Utilizing MIRAFI RS380i geotextile fabric, this project overcame poor subgrade conditions to construct four commercial buildings with stable platforms for parking lots and loading docks.